Geotechnical emergency response
Continuous monitoring of potential failures in open pits and waste dumps, set up at short notice, with recommendations on how to respond. Found mining-induced cracks on a pit slope or a dump? We will put them under monitoring as fast as possible
How we work
Here is what we do and in what order:
- 1
We send you a commercial proposal
same day - 2
Our engineers travel to the site on the basis of a letter of guarantee (after a counterparty check)
2–3 days - 3
We start monitoring with automated portable NUR extensometers (more about the extensometer)
3–4 days - 4
We carry out a geomechanical survey of the deformation and fill in the deformation record
3–4 days - 5
We identify the likely causes of the deformation and the gaps in what is known about the deforming area
3–4 days - 6
We carry out additional field investigations
3–5 days - 7
We hold a video conference between the client and our senior engineers to agree on response measures, and we develop measures to minimize the consequences of a potential failure
4–5 days - 8
We forecast how the deformation will develop and justify the critical deformation parameters
4–5 days - 9
We prepare a final report covering steps 2–8
2 weeks - 10
We support the monitoring: we set up alerts for when critical parameters are exceeded, predict the time of failure, report on how the deformation is developing and give you online access to displacement and velocity charts
6 months